A three-brick PowerMax 8000 is running PowerMaxOS 5978.444.444. The system is configured with Flash Drives RAID 5 (7+1). The customer wants to expand the capacity with SCM drives.
Which minimum configuration is supported?
Refer to the exhibit.
What should be done first to recover from this Concurrent SRDF/Star configuration failure?
An administrator has added custom SSL certificates. Each time a client connection is made, default certificates are used.
Which step must be completed?
SRDF/Metro is deployed in a clustered host configuration. The RDF link state is partitioned, and the R1 side has full read/write capability to the application.
What is the state of the R2 device?
While using DELL EMC Data Erasure on a PowerMax, what is the minimum number of overwrites needed to support compliance with internal policies and regulatory requirements?