A consultant is preparing to foundation over a customer network that has the following criteria:
* VLAN segmented network
* VLAN tags on the nodes must be imaged prior to starting the foundation process.
For each node, the consultant has done the following:
* Connected to the Network Crash Cart of the Node
* Logged in using ''root'' credentials
What should the consultant do next?
A consultant has deployed a new Nutanix AHV cluster with Foundation. The customer requests separating the management and production traffic in the CVM.
Which feature should the consultant configure?
During the Foundation imaging process, nodes are successfully imaged, but the cluster creation fails.
Which log should the consultant review to determine the cause?
A consultant is using a customer's switch for installation. Although the 10GbE ports for each of the hosts are connected to the switch, the nodes fail to be discovered.
What is causing the issue?
A consultant notices while assigning VLAN tags to hosts and CVMs in a running cluster, that Prism Element displays alerts indicating a node is down.
What should the consultant do to prevent these alerts?