An architect is designing a Cloud Management solution for a customer to create a private cloud. The customer wants to enable self-service provisioning for their business users to their existing VMware virtual environment. After initial discovery workshops, the following information have been gathered:
The customer, in the future, may need to start supporting the deployment of services to public cloud.
The customer has existing vCloud Suite Advanced license entitlement covering all of their virtual environment.
There is no budget for additional licensing at this time.
What should the architect document as a risk in the design?
An architect is designing the deployment of vRealize Log Insight (vRLI) in their data center. The customer has the following requirements:
vRLI cluster responds to multiple Virtual IP Addresses (VIPs)
Each event message received from a VIP is associated with a tag
Which two design decisions would the architect make to achieve the requirements? (Choose two.)
An architect is responsible for creating a new design to centralize the logging infrastructure for an existing vSphere environment. The key stakeholder in the project has provided the following list of requirements:
The management solution must forward all logs to the existing centralized Security Incident and Event Management (SIEM) solution.
The management solution must be a minimum of N + 1 resilient.
The management solution must provide the ability to view at least 2 months of live data.
The management solution must meet a monthly uptime SLA of 99.9%.
The management solution must support the collection of logs from ten geographically separated data center locations.
The management solution must support the collection of a minimum of 10,000 events per second.
Given the information from the stakeholder, which two statements would be considered functional requirements? (Choose two.)
An architect has been engaged to update an operations management solution design to include VMware vRealize Suite Lifecycle Manager (vRSLCM) so that the support team can reduce the complexity of environment and content management activities. The customer has provided the following information with regards to the existing environment:
There are four environments for business applications:
Development
Staging
Production
DR
The solution consists of two well-connected data centers (with low latency, high bandwidth links).
All Production workloads and management tooling are deployed to Data Center 1 (DC1).
All Staging, Development and DR workloads run in Data Center 2 (DC2).
Each physical data center has one vCenter Server and a sufficient number of hosts for workload and management.
There are two separate VMware vRealize Operations (vROps) clusters, one in each data center location.
Currently all content is developed in the DC2 vROps cluster before being manually imported into the DC1 vROps cluster.
Which two design decisions should the architect include in the solution? (Choose two.)
An architect is responsible for creating the design for vRealize Operations. The following requirements, constraints, and recommendations were gathered:
Enable Continuous Availability
Monitor two physical locations
The sizing guide recommends deploying 5 analytics nodes
What are two design considerations for the analytics node deployment? (Choose two.)