A vSAN architect is using the vSAN Sizer to build an All-Flash vSAN cluster for an accounting company. The architect is trying to determine why 12 TBs are set aside for system overhead and is reviewing the items that are include in the overhead capacity.
Which two items are included? (Choose two.)
While preparing to update a vSAN cluster, an administrator finds that the firmware revision of the onboard storage controllers is no longer listed as supported in the Hardware Compatibility Guide, but new firmware is available.
Which action should the administrator take upon discovering this piece of information?
A vSAN administrator has recently upgraded to vSAN 7.0 U1. The vSAN administrator wants to control the amount of Capacity Reserve to use the underutilized capacity of -140TB in the cluster of 12 vSAN ReadyNodes & 400TB storage for vSAN internal operations.
Which two options should be used to accomplish this goal? (Choose two.)
A currently-deployed vSAN cluster must deliver persistent storage to be used by vSphere with Tanzu. The administrator needs to properly configure the vSAN Direct Configuration for this solution.
Which three steps should be taken? (Choose three.)
An enterprise company is carrying out a planned yearly power test on specific platforms, and the infrastructure administrator has been asked to power down a vSAN 7.0 U1 cluster containing production virtual machines. The management workloads, such as the vCenter Server, are running on a different platform.
Which action should the vSAN administrator take to ensure it is safe to complete this task?