A project team has three principal participants with LEED AP credentials. One is an energy modeler, one is a civil engineer and the third one is a general contractor. Under which category can their credentials contribute a point?
Which methodology is used to evaluate and study the economic performance of a building or system over its entire life?
The cost of Commissioning (Cx) Is often repaid with
Which of the following Is the recommended tool for the project team to utilize In order to determine the target certification level?
For benchmarking purposes, a baseline building performance is evaluated (by means of energy simul-ation model), as defined in