Systems and structures are the basis for allowing people to change their behaviors permanently and are accomplished through which of the following?
The Control Plan is created following the finalization of the Measure Phase and can be closed when?
A Monitoring Plan put into place at the conclusion of a project will provide for adequate systems with key metric readouts indicating out-of-spec conditions.
An important factor in a viable _________ is to determine who, when and to what level various personnel must be trained to maintain the improvements made to a process.
A Lean Principle that states the process of eliminating waste is a continual process requiring one to always be on the lookout for ways to reduce the seven elements of waste is known as ____________ .