Identify the correspondences between the different tools (listed from 1 to 3) and their objectives and characteristics (listed from A to F).
1. Load generator.
2. Load management console.
3. Monitoring tool.
1. It monitors, records and/or analyzes the behavior of the component or system under test.
2. It creates the load and also collects the metrics for later communication.
3. It provides the control to start and stop the creation and execution of the user simulation.
4. It aggregates metrics from the various transactions that are defined within the load instances
5. It creates and runs multiple client instances that simulate user behavior.
6. It can effectively support a root cause analysis of performance in a system under test.
SELECT ONE OPTION
Identify the activity that is NOT part of the performance test preparation.
SELECT ONE OPTION
Scenario
James is participating in a project In which a web portal is being developed to sell tickets for different types of events.
Once the sale has been made and confirmed by the payment channel, the information must be available to the rest of the types of user (for example, the managers of each event) In a maximum time of 2 seconds (It Is expected that this temporal constraint will be met in 95% of the transactions and that 90% of the transactions will be completed at 100%).
Ticket sales take place during a time window (start date and time, end date and time) that is announced in advance. At the beginning of this window, there are peaks of 150 users per minute, for 5 minutes.
Question
Choose the option that enables James to meet the performance target.
SELECT ONE OPTION
If a performance test is testing the response time of an application to be connected through remote access, which protocol is being used?
SELECT ONE OPTION
Choose the option that BEST describes valid opportunities for the dynamic performance testing.
SELECT ONE OPTION