An engineer has the following configuration:
The data center is supplied with power from two independent external sources.
Power distribution units (PDUs) on the left of the rack are wired to one power source. PDUs on the right are wired to the other source
Chassis are fully populated with Power Supply Units (PSUs)
How should chassis power be configured for maximum availability?
An engineer is upgrading a blade chassis from a single CMC to dual CMC. After the upgrade, the engineer checks the CMC status in the GUI. The blade chassis reports that the CMCs are not redundant. What two things should be verified to identify the problem?
Exhibit
An engineer is logged into the CMC with an SSH session. From there the engineer gets the output shown in the exhibit and the session appears to be hung up. What should the engineer do to fix the issue?
What are three valid methods of capturing the configuration of a server node for re-deployment through CMC?
A customer has a VRTX with Shared PERC External cards cabled as shown in the exhibit. Which connection needs to be swapped to fix the cabling?