U-shape flow layout can utilise handling equipment if the high demands items locate adjacent to shipping docks. Is this statement true?
PPC Refinery (UK) must close down an out-of-date refinery which has very poor environmental performance. The refinery is very sophisticated with many technically complicated machineries, lubricants, coolants and other chemical substances. Decommissioning the refinery is highly risky and hazardous. To manage the decommissioning process well, PPC project team must know these machineries and substances in details. Which document can provide the technical details on the refinery?
Which of the following lists all components, ingredients, and materials required to produce the final product?
Ranger Mobile Ltd is a emerging smartphone manufacturer. The manufacturer adopts the just-in-time method: First, the customers make orders, then it will decide which components to be pur-chased according to the bill of materials. These components are known as which of the following?
In just in time production system, when is an upstream production triggered?